Odoo Engineering Change order for MRP Routing
ECO for MRP Routing in Production
Probuse Admin
Manufacturing Routings
Odoo Engineering Change Order (ECO)
An engineering change order (ECO) is a documentation packet that outlines the proposed change of Routing for items.
Main Features:
- This app allow you to create Engineering Change Order (ECO) of Routing.
- Routing will be maintain using version information.
- Workflow of full approval process and activation of new version of Routing.
- PDF report of Engineering Change Order (ECO) of Routing.
- On activation OLD Routing will be inactive and new version Routing will be activated.
- For more details please watch below screenshots and video
Menus Available:
- Manufacturing
- Engineering Change Orders
- Routing Change Orders
Workflow User Sample in Screens and Video
- New ==> Process ==> Validate ==> Activated Routing
- Download Now