Odoo Engineering Change order for Bill of material bom
ECO BOM
Probuse Admin
Bill of Material (BOM)
Odoo Engineering Change Order (ECO)
An engineering change order (ECO) is a documentation packet that outlines the proposed change of Bill of material for product / items.
Main Features:
- This app allow you to create Engineering Change Order (ECO) of Bill of Material.
- Bill of Material will be maintain using version information
- Workflow of full approval process and activation of new version of BOM.
- PDF report of Engineering Change Order (ECO) of Bill of Material.
- On activation OLD BOM will be inactive and new version BOM will be activated.
- For more details please watch below screenshots and video
Menus Available:
- Manufacturing
- Engineering Change Orders
- Bom Change Orders
Workflow of ECO
- New ==> Process ==> Validate ==> Activated BOM
- Download Now